Share
Project details Latest and Trendy, Traditional, Modern, Contemporary Homes Designs

Kerala home basement work Thrissur

Basement work running at vellamkaloor, Thrissur

Basement work has started on a new project to be built on a low budget.
Extreme care must be taken in the construction method to ensure that the floor does not become a threat to the building. If the floor is not well built, its shortcomings can never be remedied. Therefore, build the floor very carefully.

It is enough for a residential home construction a 1.5 feet high and 1.5 feet wide basement.
During all construction stages watering is a must. This will help curing of cement. When the floor is finished, it will be leveled with clay. Pour water on the earth filled portion also. This will help to set the earth properly. It is good if there is rain on this stage. Give a gap of one or two weeks to start next works.

Please follow and like us:
Social media & sharing icons powered by UltimatelySocial